Shut down and lock out the generator, disconnect the load cables, the voltage regulator and any rectifier diodes, and separate the neutral from earth so only the winding insulation is under test. Then connect the insulation tester between the winding leads, tied together, and the clean, bare frame, apply a DC test voltage suited to the winding’s rated voltage, commonly 500 V DC for low-voltage machines, and record the reading at one minute and, ideally, at ten minutes. Correct the reading for winding temperature, compare it with the minimum guidance and with previous results, and discharge the winding to the frame before touching any lead.
What the test tells you about the winding
An insulation resistance tester, often called a megger, applies a high DC voltage between a conductor and earth and measures the tiny current that leaks through the insulation. Good insulation has very high resistance, typically in the hundreds or thousands of megohms. Moisture, dust, oil, carbon tracking and ageing provide paths for current and drag the resistance down.
The current measured has three parts. A capacitive charging current dies away within seconds. An absorption current falls more slowly as the insulation’s molecules polarise. The leakage current stays roughly constant. Clean, dry insulation shows resistance that keeps rising for several minutes as absorption current falls. Wet or contaminated insulation shows a reading that levels off quickly, because leakage dominates from the start.
That is why the ratio of the ten-minute reading to the one-minute reading, called the polarization index, is so useful. It is less sensitive to temperature than a single spot reading and tells you about the condition of the insulation rather than just its size. For a broader comparison of this test against a simple continuity check, see insulation tester vs continuity test.
Test voltage and minimum values
Widely used guidance for rotating machines, IEEE 43, links the DC test voltage to the winding’s rated voltage and sets recommended minimums. Your generator maker’s manual takes priority if it gives different figures.
| Winding rated voltage | Typical DC test voltage |
|---|---|
| Below 1,000 V | 500 V |
| 1,000 to 2,500 V | 500 to 1,000 V |
| 2,501 to 5,000 V | 1,000 to 2,500 V |
| 5,001 to 12,000 V | 2,500 to 5,000 V |
| Above 12,000 V | 5,000 to 10,000 V |
For judging the result, that guidance gives a minimum one-minute value corrected to 40 degrees C. For most modern form-wound windings the figure is 100 megohms; for random-wound machines and form-wound machines below 1 kV, it is 5 megohms. A polarization index of at least 2.0 is the usual target for modern insulation classes. Treat these as minimums for whether it is safe to apply full voltage, not as a sign of good health; a winding that has always read thousands of megohms and now reads 50 has a problem even though 50 is above the floor.
Temperature has a large effect. As a rule of thumb, insulation resistance roughly halves for each 10 degree C rise. A reading of 200 megohms taken at 20 degrees C corresponds to about 50 megohms at 40 degrees C. Always note the winding temperature with each reading.
Step by step on a typical brushless generator
- Shut down and lock out. Stop the engine, disable auto-start, isolate the battery, and lock out the output breaker. Verify the output terminals are dead with a voltmeter rated for the system.
- Disconnect the load. Lift the load cables from the output terminals so you test only the generator, not the building wiring.
- Disconnect electronics. Unplug the automatic voltage regulator, and disconnect or short out the rotating rectifier diodes and any surge suppressor on the exciter. The test voltage can destroy semiconductors.
- Separate neutral from earth. Remove the neutral to frame bond link for the duration of the test, and note where it goes.
- Join the phase leads. Tie all stator output leads, including neutral, together with a short jumper so the whole stator is tested to frame at once.
- Connect the tester. Line lead to the joined winding leads, earth lead to a clean, bare point on the frame. Keep leads off the floor and away from each other.
- Apply the voltage and record the reading at one minute. If you are measuring polarization index, keep the test running and record at ten minutes.
- Discharge. Most testers discharge automatically at the end of the test; keep the leads connected until the display shows the voltage has fallen. Leave a winding connected to frame for several times the test duration after long tests; insulation can recover charge.
- Test the exciter and rotor separately if the maker recommends it, usually at a lower voltage.
- Restore everything: neutral-earth bond, regulator, diodes, load cables.
A multifunction installation tester with an insulation range, such as the Kyoritsu KEW 6010B, can suit small low-voltage generators, provided its insulation test voltages include the one the maker specifies. Larger machines with higher-voltage windings and long polarization index tests need a dedicated insulation tester with higher test voltages; our list of insulation resistance testers explains which ranges suit which jobs.
Interpreting what you read
- High reading, rising over time, PI above 2: insulation dry and healthy.
- Moderate reading that settles quickly, PI near 1: moisture or surface contamination. Clean and dry the winding, then retest.
- Very low reading or near zero: a direct fault to frame, severe contamination or a missed connection such as the neutral-earth bond still in place. Recheck the setup before condemning the winding.
- Reading lower than last time under similar conditions: trend matters. Log every result with temperature and humidity.
To dry a damp generator, use low-temperature heat: space heaters inside the enclosure, anti-condensation heaters, or, on some machines, controlled low current through the winding following the maker’s method. Retest regularly as it dries; resistance usually dips at first as moisture moves, then climbs.
Safety boundaries
An insulation tester produces hundreds or thousands of volts, and a generator winding stores charge like a capacitor. Treat test leads and terminals as live until the tester shows zero and the winding has been discharged. Never test with the engine able to start, and never on a machine connected to the building or the grid.
Medium-voltage machines, hazardous-area generators and anything under warranty or a service contract should be tested by a qualified technician following the maker’s procedure. If your readings are below the minimum or falling fast, do not run the generator under load until it has been assessed, because a winding failure under load can cause fire and arc flash.
Start a test log now
Record today’s one-minute and ten-minute readings, the test voltage, winding temperature and ambient humidity on a simple sheet kept with the generator. The next test only becomes meaningful when you can compare it with this one under similar conditions.
Frequently Asked Questions
What megger voltage should I use on a 240 V generator?
Typical guidance for windings rated below 1,000 V is a 500 V DC test. Check the generator maker's service manual, which may specify a different value.
What is a good megger reading for a small generator?
Healthy, dry windings often read in the hundreds of megohms or more. For low-voltage random-wound machines, common guidance sets a minimum around 5 megohms corrected to 40 degrees C, but a reading far below previous results is a concern regardless.
Do I need to disconnect the AVR before megger testing?
Yes. The test voltage can damage the voltage regulator, rectifier diodes and surge suppressors. Disconnect or short them out according to the maker's instructions.
What is the polarization index?
It is the ten-minute insulation resistance reading divided by the one-minute reading. A value of 2 or more usually indicates clean, dry insulation; close to 1 suggests moisture or contamination.
Can I megger test a generator while it is warm?
Yes, but record the temperature and correct the reading. Insulation resistance falls as temperature rises, so a warm winding reads lower than the same winding cold.